Industrial Landfill Construction
Tri-Core, in partnership with Titan Environmental, was engaged by Gibson Energy to construct a Class II Industrial Landfill site that satisfies Provincial regulatory requirements.
The construction project was a massive earth moving project that involved:
- Placement of compacted clay borrow materials, rip rap and erosion control;
- Construction and Installation of complex water management systems; and
- Installation of an engineered multi-layer geosynthetic liner system with leachate collection system.